Project Title: New production of casein.


This document was prepared by the Ministry of Foreign Economic Relations of Ukraine in conjunction with UNIDO in March of 1996 and has been posted to the Internet with the permission of the NY District Office of the Ukrainian Trade Mission. It is an abridged version of the UNIDO application as prepared by the Ukrainian applicant. For further information or a copy of the full report, you may reach the Chief Ukrainian Trade Representative Mr. Ihor Gayduchok at the Consulate General of Ukraine, 240 E. 49th St., New York, NY. Voice/Fax message center: 212-371-5895 or by E-Mail at gayducho@panix.com


UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION
Vienna International Centre Phone (038044) 290 37 51
P.O. Box 300, A-1400 Vienna, Austria Fax (038044) 290 72 59



Country UKRAINE Project No: UKR/007/V/95-11 ISIC: 3112

PART 1

1.1. Name of Sponsor: Ukrainian International Forum Kiev
Address : 252010 Ukraine, Kiev, Janvarskogo Vosstania St. 11A Buro: 108, 113, 115
Phone : (038044) 290-12-30, 290-37-51
Telex : Fax : (038044) 290-72-59
Contact Person : Mr. S. Pachkovsky - President,

Mr. D. Makarenko - Executive director,
Mrs. S. Koptseva - Manager of investment projects

1.2. Business experience (of the proposed applicant):

1.3. Annual Turnover (gross sale in US$) : 19 million US$

1.4. Present ownership : collective

1.5. Share capital (nominal) :

1.6. Bank connections :

1.7. Affiliated companies:

1.8. Year of establishment : 1995

1.9. Number of employees: 8,560

2.1. Describe briefly the purpose of the project:

2.2. Is this a new project or an expansion/modernization of an existing project?

Who initiated the project and when?

2.3. What background information is available on the project (e.g. pre-feasibility study)?

2.4. Describe the main characteristics of the product(s) to be produced (type, quality, etc.)

2.5. Give the conversion rate of the local currency to the US $ to be applied to the information provided

2.6. Estimated investment costs (in Millions of US$)

Proposed sources of financing by the local partner

2.7. Foreign cooperation sought (please indicate types of cooperation preferred - more than one allowed):

2.9. Approximately how much time do you estimate will elapse from the time the investment decision is taken (e.g. when joint venture contract is signed) to start-up of the plant?

PART II.

CAPITAL STRUCTURE (Thousand US$)

Local

Foreign

Equity

420

600

LOCAL MARKET (please supply as much data as possible).

At what rate is the local market expected to expand over the next few years?

How is the demand for each product being satisfied at the present?

Does your country already export the product(s) to be manufactured by the proposed plant? If yes, to which countries?

To which countries do you expect to export the product of this project?

What are the existing or planned capacities for local production of materials and intermediate products, e.g. how large are the proven and exploitable reserves of local materials?

Describe the problems or restriction (if any) you foresee in exploiting local resources in the future.

yes no
Is sufficient electricity already available at the proposed site to operate plant at full capacity?

X

If not is supply planned for the future?
Is there information available on electricity supply failures and interruptions?

X

Is the supply of water constant?

X

or are there seasonal variations?
Is the quality of the water at the proposed site satisfactory?

X

or are treatment facilities such as sea water desalination required?

Where is the factory to be built or expanded?

Why was this location selected?

Is there a Free Trade Zone or an Industrial Estate in which the factory could be built?

Is land readily available? If not, indicate how you propose obtaining land.

Are adequate transport facilities (road, rail, port) available at the proposed site?

Are post and telecommunication facilities available?

What environmental impacts are expected to result from the project?

Are existing waste disposal (effluent treatment) facilities adequate?

LABOUR

Pay rates: (US $) Total